Define scope with a work breakdown structure – HR Management

Assignment 1: Define Scope with a Work Breakdown Structure

In the previous module, you began to plan for scope by developing a Project Charter and a Project Scope Statement. Now you will continue with Scope Planning by developing a work breakdown structure (WBS).

Procedure

1.Review the results from the previous application (the Project Charter and the Project Scope Statement).

2.Create a work breakdown structure for the project, using these criteria: ?It must be easy to interpret, such as a hierarchical list and/or a flow chart.

3.It must be possible for your instructor and other classmates to view it.

Published by
Essays
View all posts